PostTue Oct 23, 2012 3:52 pm » by The57ironman


.

Japan Geigermap : At-a-glance

http://japan.failedrobot.com/





....credit to Muchtyman

japan-geigermap-at-a-glance-t80034.html
Mark Twain:

Be careful about reading health books. You may die of a misprint.

Image

.

Super Moderator
User avatar
Posts: 17578
Joined: Thu Jul 22, 2010 4:20 am
Location: babysitting

PostMon Nov 05, 2012 9:46 pm » by The57ironman


.


China refused importing Japanese frozen saury for excessive cadmium
Posted by Mochizuki on November 5th, 2012
On 6/13/2012, Shandong China refused Japanese frozen saury and sent 24 tones (4,560,000 JPY) back to Japan. They measured excessive cadmium, which was over the safety limit. Ag-110m turns to be cadmium (Cd-110) by beta-decay. Half-life of Ag-110m is 250 days, Ag-110m has been measured from fishery products at least offshore Fukushima. (cf. Radioactive silver, [...]

http://fukushima-diary.com/category/dnews/



.......be sure you're eating some fish...i hear it's good for you... :mrcool:

Image




.
Mark Twain:

Be careful about reading health books. You may die of a misprint.

Image

.

Super Moderator
User avatar
Posts: 17578
Joined: Thu Jul 22, 2010 4:20 am
Location: babysitting

PostWed Nov 14, 2012 10:41 pm » by The57ironman


.

.......it ain't going away... :peep:


Fukushima prefectural birth rate rapidly dropping in 2012

Image


According to Fukushima prefecture, the birth rate is rapidly dropping.

2008.10~2009.9 : 8.06 ‰
2009.10~2010.9 : 7.92 ‰ (↓0.14‰)
2010.10~2011.9 : 7.75 ‰ (↓0.17‰)
2011.10~2012.9 : 6.99 ‰ (↓0.76‰)

Birth rate = (Birth from October to next September ) / (Population of March) × 1,000

The latest population statistics published by the local government is still September.2012, so it’s counted from October to September.

http://fukushima-diary.com/2012/11/fuku ... g-in-2012/



.
Mark Twain:

Be careful about reading health books. You may die of a misprint.

Image

.

Super Moderator
User avatar
Posts: 17578
Joined: Thu Jul 22, 2010 4:20 am
Location: babysitting

PostMon Nov 19, 2012 7:34 pm » by The57ironman


.


:peep:


Japanese public agency anticipates the increasing uterine cancer cases of under 44 y.o. for the next 30 years..

http://fukushima-diary.com/category/dnews/


.
Mark Twain:

Be careful about reading health books. You may die of a misprint.

Image

.

Super Moderator
User avatar
Posts: 17578
Joined: Thu Jul 22, 2010 4:20 am
Location: babysitting

PostSat Nov 24, 2012 1:13 am » by The57ironman


.

...thanks evildweeb... :pray:





Upload to Disclose.tv

Mark Twain:

Be careful about reading health books. You may die of a misprint.

Image

.

Super Moderator
User avatar
Posts: 17578
Joined: Thu Jul 22, 2010 4:20 am
Location: babysitting

PostMon Dec 03, 2012 9:36 pm » by The57ironman


.


...............Image


Almost half of Fukushima children now have thyroid disorders from radiation poisoning, officials blame 'too much seafood'



Upload to Disclose.tv





(NaturalNews) Not much information comes out of Japan about Fukushima anymore, and the American MSM seems to have forgotten what watered down reporting they had done earlier. But the human suffering has begun in Japan, and even the Japanese government is trying to pretend it's not happening.

The curtain is pulled over the total impact of this disaster to protect the nuclear power industry. The government and media blackout has become known as "plume gate" for the radioactive plume that was released from the Fukushima mishap.

Learn more: http://www.naturalnews.com/038185_Fukus ... z2E1CzEyBT
Mark Twain:

Be careful about reading health books. You may die of a misprint.

Image

.

Initiate
User avatar
Posts: 899
Joined: Fri Sep 17, 2010 6:52 am

PostWed Dec 19, 2012 1:49 am » by I2haveseen


Fukushima plant situation 'volatile,' a year after cold shutdown declared.
Image

Workers are nowhere close to determining the state of melted fuel at the Fukushima No. 1 nuclear plant, a year after the government declared the damaged reactors were in a “cold shutdown” state.

Storage tanks at the site are nearing capacity for radioactive water. A makeshift system is still being used to cool the nuclear fuel. And leaks of contaminated water and quake-induced collapses of plant facilities remain a threat.

Although progress has been made in clearing rubble and reducing the amount of radioactive substances released from the plant, NRA Chairman Shunichi Tanaka acknowledged that preparations to decommission the reactors are only slowly getting under way.

"Workers have been obliged to respond with highly stopgap measures," Tanaka said. "Many devices, such as a purifier for radioactive water, have been installed with no time for sufficient design considerations and safety screenings.

“The situation surrounding the decommissioning process is volatile, so there is a need for constant reviews in securing safety."

The No. 1, No. 2 and No. 3 reactors at the Fukushima plant melted down after the Great East Japan Earthquake struck off the coast of northeastern Japan on March 11, 2011, spawning a tsunami that devastated coastal communities and knocked out power to the plant.

After a furious battle to bring the situation under control, Prime Minister Yoshihiko Noda on Dec. 16 last year declared that the three reactors at the plant had reached a state of cold shutdown, a term used when a normally operating reactor is taken offline and remains at a cool temperature on a stable basis.

But the decommissioning process, including the No. 4 reactor that contained no fuel at the time of the disaster due to a regular inspection, is expected to take decades to complete.

The decommissioning work also represents an imminent challenge for the Liberal Democratic Party, which will control the government following its victory in the Dec. 16 Lower House election.

The government and Tokyo Electric Power Co., the plant operator, presented a road map on Dec. 21 last year that established landmarks for the eventual decommissioning of the four reactors.

Goals for the period to spring 2013 included endoscopic inspections of the interiors of reactor containment vessels and a reduction in the length of pipes used in the "circulating water cooling" system, which recycles radioactive water to cool down the melted reactors.

Endoscope surveys of the containment vessels at the No. 2 reactor in January and the No. 1 reactor in October found radiation levels high enough to kill a human within one hour. Specifically, up to 73 sieverts per hour was detected inside the No. 2 reactor and 11 sieverts per hour inside the No. 1 reactor.

But TEPCO cannot determine the state of the melted fuel because cameras can only be inserted for a limited time period in the extremely hazardous environment.

One immediate problem facing TEPCO is the accumulation of radioactive water used to cool down the melted fuel. TEPCO says it will mobilize robots and take other measures to locate where the radioactive water is leaking from the reactors.

Storage tanks on the plant's premises have a total capacity of 257,000 tons. As of Dec. 11, the tanks contained 237,000 tons of radioactive water.

TEPCO plans to build additional tanks on deforested land to expand the total capacity to 700,000 tons within three years.

Groundwater flowing into the reactor buildings is exacerbating the radioactive water problem. TEPCO said it will dig wells west of the reactor buildings to pump up the groundwater and reduce the inflow, but little is known about groundwater flow variations, sources said.

The 4 kilometers of pipes in the "circulating water cooling" system were installed on a temporary basis in the frantic battle to keep the melted fuel submerged. They remain in the same state, and the risk of radioactive water leaking from damage on the pipes remains.

TEPCO is preparing full-scale operations of a device that can eliminate 62 varieties of radioactive substances from the contaminated water. But the device is still being tested for durability, and the government's Nuclear Regulation Authority has yet to give the green light for its use.

Rubble has been removed from the No. 4 reactor building, which was severely damaged in a hydrogen explosion in the early stages of the disaster and received relatively light contamination from radioactive substances.

TEPCO removed two nuclear fuel assemblies from the No. 4 reactor building's storage pool on a trial basis in July. The assemblies showed no signs of damage or deformities, and the utility plans to start removing the remaining fuel in November 2013.

Still, about 3,100 nuclear fuel assemblies, including unspent ones, are now sitting in the storage pools of the No. 1 through No. 4 reactor buildings.

The amount of radioactive substances released from the reactor buildings has remained low since February. In November, a maximum of 10 million becquerels were leaking from the No. 1 through No. 3 reactors per hour, only one-sixth the discharge rate in December 2011.

But Fumiya Tanabe, a former chief research scientist at the now-defunct Japan Atomic Energy Research Institute, said persistent danger surrounds the plant's reactors.

"Despite the (officially declared) cold shutdowns of the reactors, the cooling functions have been maintained there with no knowledge of where the melted fuel lies and in what state," Tanabe said. "There is a risk of unforeseen circumstances arising if another major earthquake hits."

http://ajw.asahi.com/article/0311disast ... 1212180087
Hey trolls.... If you want to rip me a new one, You better have a sharp set of nails.
▲Not an invitation peeps..... It's a warning.

Super Moderator
User avatar
Posts: 17578
Joined: Thu Jul 22, 2010 4:20 am
Location: babysitting

PostWed Dec 19, 2012 1:56 am » by The57ironman


.


.......what a sin to mother earth.....Image


.
Mark Twain:

Be careful about reading health books. You may die of a misprint.

Image

.

Initiate
User avatar
Posts: 899
Joined: Fri Sep 17, 2010 6:52 am

PostSat Dec 22, 2012 12:37 am » by I2haveseen


Fukushima Daiichi Nuclear Plant Weekly Review.
The successful removal of a beam dropped into a spent fuel pool, the first Tokyo Electric Power Co. settlement related to the death of an evacuee and a higher seawall at the Hamaoka nuclear plant highlighted the last week's news from Japan.

Developments related to the Fukushima Daiichi power plant severely damaged following last year's earthquake and tsunami include:

Fukushima unit 3 spent fuel pool. Source: TEPCOBeam Removed from Unit 3 SFP

While clearing debris from around the unit 3 spent fuel pool on Sept. 22, a piece of remotely operated equipment dropped a steel beam into the water. TEPCO workers retrieved it Thursday, according to a release, after practice runs using a mockup of the beam and the SFP. Before the beam was lifted from the pool and set on the ground next to the reactor building, crews also lowered a system of rods and chains into the SFP to protect its liner during the procedure. A water purification system was also installed that TEPCO said doubled visibility in the pool to 5 meters. No damage to the liner or changes in plant conditions were detected after the beam was removed.

TEPCO Settles Evacuee Death Suit.

TEPCO has agreed to compensate the family of a hospitalized woman who died after evacuating a city in Fukushima Prefecture. It is the first settlement of its kind, Jiji Press reported, and TEPCO agreed to pay about $174,000 and acknowledged that the evacuation was a factor in her death. The evacuation itself, rather than bodily damage from radiation, was at issue.

Hamaoka Plant Will Raise Tsunami Barriers

Chubu Electric Power Co. announced Thursday that it will build a new tsunami barrier 4 meters higher than originally planned at its Hamaoka nuclear plant. When completed, it will stand at 22 meters tall, Kyodo reported. Government estimates have concluded that 19-meter-high tsunami is possible at the plant in the event of a large earthquake in the Tokai region.

Image
Photo: Unit 3 spent fuel pool from above, with a portion of the liner protection system visible at its edges (Source: TEPCO).

http://nuclearstreet.com/nuclear_power_ ... 22102.aspx

Related stories:
http://news.google.com.au/news/story?nc ... =en&geo=au
Hey trolls.... If you want to rip me a new one, You better have a sharp set of nails.
▲Not an invitation peeps..... It's a warning.

Super Moderator
User avatar
Posts: 17578
Joined: Thu Jul 22, 2010 4:20 am
Location: babysitting

PostSun Dec 23, 2012 4:32 pm » by The57ironman


I2haveseen wrote:Fukushima Daiichi Nuclear Plant Weekly Review.
The successful removal of a beam dropped into a spent fuel pool, the first Tokyo Electric Power Co. settlement related to the death of an evacuee and a higher seawall at the Hamaoka nuclear plant highlighted the last week's news from Japan.

Developments related to the Fukushima Daiichi power plant severely damaged following last year's earthquake and tsunami include:

Fukushima unit 3 spent fuel pool. Source: TEPCOBeam Removed from Unit 3 SFP

While clearing debris from around the unit 3 spent fuel pool on Sept. 22, a piece of remotely operated equipment dropped a steel beam into the water. TEPCO workers retrieved it Thursday, according to a release, after practice runs using a mockup of the beam and the SFP. Before the beam was lifted from the pool and set on the ground next to the reactor building, crews also lowered a system of rods and chains into the SFP to protect its liner during the procedure. A water purification system was also installed that TEPCO said doubled visibility in the pool to 5 meters. No damage to the liner or changes in plant conditions were detected after the beam was removed.

TEPCO Settles Evacuee Death Suit.

TEPCO has agreed to compensate the family of a hospitalized woman who died after evacuating a city in Fukushima Prefecture. It is the first settlement of its kind, Jiji Press reported, and TEPCO agreed to pay about $174,000 and acknowledged that the evacuation was a factor in her death. The evacuation itself, rather than bodily damage from radiation, was at issue.

Hamaoka Plant Will Raise Tsunami Barriers

Chubu Electric Power Co. announced Thursday that it will build a new tsunami barrier 4 meters higher than originally planned at its Hamaoka nuclear plant. When completed, it will stand at 22 meters tall, Kyodo reported. Government estimates have concluded that 19-meter-high tsunami is possible at the plant in the event of a large earthquake in the Tokai region.

Image
Photo: Unit 3 spent fuel pool from above, with a portion of the liner protection system visible at its edges (Source: TEPCO).

http://nuclearstreet.com/nuclear_power_ ... 22102.aspx

Related stories:
http://news.google.com.au/news/story?nc ... =en&geo=au

.


......thanks brother...


:peep:
.
Mark Twain:

Be careful about reading health books. You may die of a misprint.

Image

.


PreviousNext

  • Related topics
    Replies
    Views
    Last post
Visit Disclose.tv on Facebook